On to roofing, plumbing
and central air… things are moving fast so keep up. Friday, 11 March 2016, was a busy day at our
house. Roofers continued the momentum the
framers came and went with, done in one day and coming back to finish the roof
vent and pipe collars.
HVAC was nearly
completed on Friday except a few things in the basement. I really like the trunk style runs in the attic
and the glue/ filler they use to seal the pipes from letting air escape. One issue, not really a problem, but
something to be moved…. In our basement
they placed an air return in the center of the wall where we want to put a wet
bar, it would interfere with the cabinets and overall layout. RESPONSE
from Project Manager: I’ll meet with HVAC contractors to move it over a bit.
Plumbing did their thing
and nearly completed as well. A few more
pipes to connect in the main level and basement. Another little concern about rain leaking
down the roof vent pipe, but this was fairly normal due to what I mentioned
above. Roofers are to install the pipe collar on their next available
stop.
Us being nitpicky and having great PMs! We were told on our initial pre-construction
meeting that the basement sometimes comes with a closet under the stairs. It’s not a standard option, but typically comes
prefabbed when they are framing out the house, it wasn’t installed nor a header
where we thought it should go. RESPONSE from PM: The closet isn’t a standard option, but we
talked about it at the pre-construction meeting and I have it noted to add for
you guys! The framers will frame it out when they’re in the house for their “punch
out”.